The History of the Egnatia Motorway
The Project Identity
The Significance of the Project
Project Cost
The Construction of the Egnatia Motorway
The Bridges
Tunnels
The Demanding Geotechnical Works
The Egnatia Motorway in Epirus
The Egnatia Motorway in Western Macedonia
The Egnatia Motorway in Central Macedonia
The Egnatia Motorway in Eastern Macedonia & Τhrace
Other EGNATIA ODOS A.E. Projects
The Egnatia Motorway Vertical Axes

  Click to increase fonts size click to decrease font size   RESET  
        

 

 
THE EGNATIA ODOS PROJECT IS FUNDED BY:
smore
EUROPEAN UNION
EUROPEAN INVESTMENT BANK
COMMUNITY SUPPORT FRAMEWORK (2000 - 2006)
NATIONAL STRATEGIC REFERENCE FRAMEWORK (NSRF) 2007-2013
PARTNERSHIP AGREEMENT (PA) 2014-2020
MINISTRY OF INFRASTRUCTURE, TRANSPORT AND NETWORKS
You are here: Homepage | THE EGNATIA MOTORWAY
THE PROJECT
|
 
The Egnatia Motorway in Epirus  
Egnatia Odos: Igoumenitsa - Panagia

See the map

The section of Egnatia Motorway that runs through Epirus and extends from Igoumenitsa Port to Panagia is 123 km long.  To date, the total of Egnatia in Epirus has been completed and opened to traffic with the exception of one bridge (T9-T11), 400 m long, on the section Arachos-Peristeri, which will soon be completed.

The motorway has been constructed as a dual carriageway, separated by a central reserve, with two traffic lanes and a hard shoulder per direction. It has a total width of 22 m.

It is one of the most difficult, from a technical point of view, sections of Egnatia Motorway due to the difficult geomorphology of the road traversal zone (the axis intersects vertically Pindos Mountain) and the serious geological problems that significally determined the alternatives of the motorway alignment.

Approximately 30% of the Egnatia Motorway total length in Epirus comprises of major technical projects. In particular, 32 twin bore tunnels covering 30 km of motorway (58 km of single carriageway) are under construction. Many split-deck bridges are also under construction covering 7.5 km of motorway (15 km of single carriageway). 5 from the bridges have total length larger than 500 m.  Moreover, 13 I/Cs have been constructed.

Some significant structures are:

Twin bore Dodoni tunnel, 3.3 km long (per carriageway)
Twin bore Driskos tunnel, 4.5 km (per carriageway) which is also the Egnatia Motorway largest tunnel
Twin bore Metsovo tunnel, 3.5 km long
Metsovitikos and Arachthos river bridges are structures of particular interest, constructed on areas of exquisite natural beauty.  Arachthos river bridge is approximately 1.000 m long, while Metsovitikos river bridge is 530 m. long and has big pier heights (>100m.) and span of 230 m.

The total cost for the completion of 123 km in Epirus amounts to € 2.2 B (exclusive of VAT). The project is being funded by national and community funds (50%) in the context of CSF II & III programs (OP-RAPUD and Epirus ROP) and Cohesion Fund. Part of the national contribution has been covered by the European Investment Bank (EIB) loans.

 


(Click on the pictures for a larger version)

See more pictures



 Print  Send


go


EMERGENCY PHONE 
1077

Submit Maintenance Service Request
Distances
Travel Time

Information

for the press



The Weather

in Egnatia Motorway



Polls

Project status map

© 2007-2019 EGNATIA ODOS Α.E. | Site Map | Terms of use | Disclaimer powered by OSMIUMTM | Creative Marketing S.A.